In October 2006 Mavi has delivered a big screener for limestone, 2.700 mm large and 7.500 mm long, to separate fines smaller than 5 mm. The CST Arcelor steel works in Vitória is revamping its limestone processing and increasing capacity .
Mavi has delivered over 5.000 vibratory machines since 1974 for steel plants in Brazil. This particular screener is the largest ever build for limestone by Mavi, driven by two E-4600 unbalanced cells, 50 HP total. The 10.000 Kg machine was build in three separated sectors, to be assembled on site, as the erecting is a rather difficult task in the existing plant.
If you would like to make any comments or questions on the above please drop us a line by clicking on the following link Mavi / questions & comments. Your comment or questions can be published here for general knowledge if acceptable.